Potential effects of internal dam-break in Stare Miasto Reservoir in Poland
Type
Journal article
Language
English
Date issued
2024
Author
Faculty
Wydział Inżynierii Środowiska i Inżynierii Mechanicznej
Journal
Journal of Hydrology: Regional Studies
ISSN
2214-5818
Volume
53
Number
June 2024
Pages from-to
art. 101801
Abstract (EN)
Study region
The research object is located in Wielkopolska province (Poland), which is well-known for its rural character and scarcity of water. To prevent droughts, small reservoirs are installed in local watersheds. It enables control of water conditions for agriculture and improvement of local climate. The main challenge is prevention from the deposition of sediments in a reservoir. To minimize this threat, the specific constructions of the reservoir are applied, e.g. internal dams.
Study focus
The Stare Miasto reservoir consists of an internal dam with the upper zone separated. The highway bridge split the main part. In 2014 a flood wave propagated through the reservoir. The crest of the internal dam was shifted generating a potential risk of internal dam failure. The consequences of such an event were analyzed using a two-dimensional hydrodynamic numerical tool that solves the shallow water equations with finite volume method on unstructured mesh.
New hydrological insight for the region
The results obtained prove that the dam break increases the risk of bridge instability. The shear stresses generated during break of internal dam may exceed 50 N/m2, what cause danger of deep scour generation under and below the construction. Unexpectedly, the existence of the bridge decreased the threat of the main dam overtopping. The study may be a valuable inspiration for the design of new reservoirs inevitable in controlling water resource conditions in the region.
The research object is located in Wielkopolska province (Poland), which is well-known for its rural character and scarcity of water. To prevent droughts, small reservoirs are installed in local watersheds. It enables control of water conditions for agriculture and improvement of local climate. The main challenge is prevention from the deposition of sediments in a reservoir. To minimize this threat, the specific constructions of the reservoir are applied, e.g. internal dams.
Study focus
The Stare Miasto reservoir consists of an internal dam with the upper zone separated. The highway bridge split the main part. In 2014 a flood wave propagated through the reservoir. The crest of the internal dam was shifted generating a potential risk of internal dam failure. The consequences of such an event were analyzed using a two-dimensional hydrodynamic numerical tool that solves the shallow water equations with finite volume method on unstructured mesh.
New hydrological insight for the region
The results obtained prove that the dam break increases the risk of bridge instability. The shear stresses generated during break of internal dam may exceed 50 N/m2, what cause danger of deep scour generation under and below the construction. Unexpectedly, the existence of the bridge decreased the threat of the main dam overtopping. The study may be a valuable inspiration for the design of new reservoirs inevitable in controlling water resource conditions in the region.
License
CC-BY - Attribution
Open access date
May 6, 2024