Variability of concentrations of phosphorus forms under the conditions of weir renovation – The Głuszynka river-lake system case study

cris.virtual.author-orcid0000-0001-9616-6184
cris.virtual.author-orcid0000-0001-5871-0097
cris.virtual.author-orcid#PLACEHOLDER_PARENT_METADATA_VALUE#
cris.virtual.author-orcid#PLACEHOLDER_PARENT_METADATA_VALUE#
cris.virtualsource.author-orcid42c13a44-7add-43d0-b4d6-fca88ee69d61
cris.virtualsource.author-orcide43999bc-c71f-42a1-b52d-5c8e82f73b45
cris.virtualsource.author-orcid#PLACEHOLDER_PARENT_METADATA_VALUE#
cris.virtualsource.author-orcid#PLACEHOLDER_PARENT_METADATA_VALUE#
dc.abstract.enTo fill the knowledge gap on the functioning of the river-lake system during the modernisation of the weir, an analysis of the variability of selected physico-chemical indicators was carried out. In the parameter analysis, particular emphasis was placed on phosphorus (P) and orthophosphate(V) (OP) content in the hydrological year 2022 and water quality was compared before, during and after the maintenance work on the discharge weir. Physico- chemical parameters were analysed monthly at four stations. Concentrations of P and OP increased significantly as a result of the refurbishment works at the measurement point located downstream of the weir (P4), which contributed to the determination of a statistically significant change point. At the same time, when high P and OP contents were observed, high electrolytic conductivity and ammonium nitrogen in water were also recorded. The content of P and OP indicators was further reduced, but their content was still several times higher than before the renovation. The renovation of the weir below Lake Jeziory Wielkie contributed to a significant deterioration of water quality in the river-lake system. Due to the nature of this system, this was of great importance for the downstream reservoirs. The statistical analysis showed that the renovation of the weir below Lake Jeziory Wielkie contributed to a significant deterioration of water quality in the river-lake system.
dc.affiliationWydział Inżynierii Środowiska i Inżynierii Mechanicznej
dc.affiliation.instituteKatedra Melioracji, Kształtowania Środowiska i Gospodarki Przestrzennej
dc.affiliation.instituteKatedra Budownictwa i Geoinżynierii
dc.contributor.authorJanicka, Ewelina
dc.contributor.authorKanclerz, Jolanta
dc.contributor.authorAgaj, Tropikë
dc.contributor.authorPolicht-Latawiec, Agnieszka
dc.date.access2024-12-05
dc.date.accessioned2024-12-05T11:00:01Z
dc.date.available2024-12-05T11:00:01Z
dc.date.copyright2024-06-12
dc.date.issued2024
dc.description.abstract<jats:p>To fill the knowledge gap on the functioning of the river-lake system during the modernisation of the weir, an analysis of the variability of selected physico-chemical indicators was carried out. In the parameter analysis, particular emphasis was placed on phosphorus (P) and orthophosphate(V) (OP) content in the hydrological year 2022 and water quality was compared before, during and after the maintenance work on the discharge weir. Physico- chemical parameters were analysed monthly at four stations. Concentrations of P and OP increased significantly as a result of the refurbishment works at the measurement point located downstream of the weir (P4), which contributed to the determination of a statistically significant change point. At the same time, when high P and OP contents were observed, high electrolytic conductivity and ammonium nitrogen in water were also recorded. The content of P and OP indicators was further reduced, but their content was still several times higher than before the renovation. The renovation of the weir below Lake Jeziory Wielkie contributed to a significant deterioration of water quality in the river-lake system. Due to the nature of this system, this was of great importance for the downstream reservoirs. The statistical analysis showed that the renovation of the weir below Lake Jeziory Wielkie contributed to a significant deterioration of water quality in the river-lake system.</jats:p>
dc.description.bibliographyil., bibliogr.
dc.description.financepublication_research
dc.description.financecost1500,00
dc.description.number61
dc.description.points100
dc.identifier.doi10.24425/jwld.2024.150273
dc.identifier.eissn2083-4535
dc.identifier.issn1429-7426
dc.identifier.urihttps://sciencerep.up.poznan.pl/handle/item/2164
dc.identifier.weblinkhttps://journals.pan.pl/dlibra/publication/150273/edition/131643/content
dc.languageen
dc.pbn.affiliationenvironmental engineering, mining and energy
dc.relation.ispartofJournal of Water and Land Development
dc.relation.pages183-189
dc.rightsCC-BY-NC-ND
dc.sciencecloudsend
dc.subject.eneutrophication
dc.subject.enorthophosphate(V)
dc.subject.enphosphorus
dc.subject.enriver-lake system
dc.subject.enweir
dc.titleVariability of concentrations of phosphorus forms under the conditions of weir renovation – The Głuszynka river-lake system case study
dc.typeJournalArticle
dspace.entity.typePublication