Emptying sewage from the valve-pit sump through service lateral to vacuum main

cris.virtual.author-orcid0000-0001-7550-288X
cris.virtual.author-orcid0000-0002-6602-2603
cris.virtualsource.author-orcid617acd22-bfa9-40ce-bbcd-f4f062e451a0
cris.virtualsource.author-orcid56c70f68-f635-4efe-a7ca-bb9fa1981a13
dc.abstract.enA simple hydraulic model of liquid and gas flow from a collecting sump via vacuum service lateral to a vacuum main has been presented. The model was formulated and validated on experimental data and CFD simulations. The standard gas (air) to liquid (sewage) volumetric ratio is roughly equal to the ratio of subsequent admittance times of these two phases, provided that the liquid plug is not fully sucked from the service lateral to the vacuum main during the valve open time. A longer air suction time is needed only when the service lateral is too short to provide enough air to transport the sewage past the nearest downstream lift on the vacuum main. Sizing properly the active sump volume and valve open time for a given service lateral length, one can provide the required air to liquid ratios along the vacuum main, thus minimizing the energy consumption by the vacuum pumps.
dc.affiliationWydział Inżynierii Środowiska i Inżynierii Mechanicznej
dc.affiliation.instituteKatedra Inżynierii Wodnej i Sanitarnej
dc.contributor.authorBłażejewski, Ryszard
dc.contributor.authorMatz, Radosław
dc.date.access2026-02-10
dc.date.accessioned2026-02-26T10:54:08Z
dc.date.available2026-02-26T10:54:08Z
dc.date.copyright2022-09
dc.date.issued2022
dc.description.accesstimeat_publication
dc.description.bibliographyil., bibliogr.
dc.description.financepublication_nocost
dc.description.financecost0,00
dc.description.if0,6
dc.description.number3
dc.description.points70
dc.description.versionfinal_published
dc.description.volume48
dc.identifier.doi10.37190/epe220306
dc.identifier.eissn2450-260X
dc.identifier.issn0324-8828
dc.identifier.urihttps://sciencerep.up.poznan.pl/handle/item/7493
dc.identifier.weblinkhttps://epe.pwr.edu.pl/2022/3_2022.php
dc.languageen
dc.relation.ispartofEnvironmental Protection Engineering
dc.relation.pages69-88
dc.rightsOther
dc.sciencecloudnosend
dc.share.typeOTHER
dc.titleEmptying sewage from the valve-pit sump through service lateral to vacuum main
dc.typeJournalArticle
dspace.entity.typePublication
oaire.citation.issue3
oaire.citation.volume48